Cyfuture Logo
Data Centers | Cloud Hosting | Tech Support BPO Services – Cyfuture Cyfuture

DATA CENTRES & AI FACTORIES

Intelligence needs
a strong foundation.

Power, cooling, connectivity and operations. Bring the physical and digital foundations of AI together with Cyfuture.

Discuss your requirements

BUILT FROM THE GROUND UP

More than space.
Infrastructure that works.

A GPU is only as useful as the infrastructure around it. We connect the data centre, compute and cloud conversation from the start.

01

Data centre & colocation

Discuss rack space, power, connectivity and operational requirements for enterprise systems and accelerated compute.

02

AI factory infrastructure

Plan for the demands of AI: power density, cooling, GPU interconnects, storage throughput and phased capacity growth.

03

Cloud & managed operations

Connect infrastructure with cloud services and operational support, with responsibilities and service levels defined for your deployment.

THE AI FACTORY APPROACH

Designed as one system.

01

Power & cooling

Align your deployment’s power envelope and cooling needs with the facility design and expansion plan.

02

Compute & connectivity

Coordinate GPUs, network fabric and storage as parts of a single workload architecture.

03

Operations & growth

Define service scope, monitoring, resilience requirements and the path to your next phase of capacity.

THE ROAD AHEAD

Thinking at gigawatt scale.

Our ambition is to develop 1 GW of AI infrastructure by 2030. Energy readiness and phased execution are central to that vision.

Explore Vision 2030

A FEW USEFUL ANSWERS

Before we begin.

What should I share for a data centre proposal?

Start with the location, IT load, rack count, target density, connectivity, cooling needs and go-live timeline. Include any compliance or business continuity requirements.

Can I discuss a phased AI deployment?

Yes. Share your initial requirement and expected growth so power, space, networking and compute can be considered together.

Is the 1 GW ambition already operational?

No. The 1 GW by 2030 figure is a forward-looking development ambition. It does not represent current installed or operational capacity.

AI FACTORY ENGINEERING

Higher density.
Connected design.

Explore the relationship between facility readiness and the accelerated workload.

Explore liquid-cooled AI factories

OUR FOOTPRINT

Built in India.
Connected to your ambition.

Cyfuture building at dusk
BUILT ON REAL FOUNDATIONS India. Connected.

INFRASTRUCTURE / INDIA

A local foundation.
A global outlook.

Our public data-center portfolio includes Noida, Jaipur, Raipur and Bangalore. Bring location, connectivity and workload requirements into the conversation from the start.

Facility options, service scope and available capacity are confirmed for each engagement.

Explore data centers & AI factories

START WITH A CONVERSATION

Build on the right foundation.

Let’s discuss your next data centre or AI factory requirement.

Talk to our team